East Side Access CH061A
Track A Cut and Cover Structure
Project Details
        TUTOR PERINI AFFILIATES
					Frontier-Kemper Constructors / Becho
Contractor
											Contract Amount: $3.04 Million				
                    OWNER
                    NYC Metropolitan Transportation Authority
                
                    LOCATION
                    New York, NY
                
                    	ARCHITECT
	                    GEC (PB/STV/Parsons)
    	            
COMPLETION
2017
Project Description
			This phase of the East Side Access project included the construction of the Stage 3 civil structures at Harold Interlocking. The work included 34 one-meter diameter primary secant piles under the bridge with low headroom, 32 one-meter diameter secondary secant piles under the bridge with low headroom, 18 one-meter diameter soldier piles, and 20 underpinning pits five feet by six feet by four feet.
RELATED PROJECTS
ESA CH053 (Harold Structures Part 1)
ESA CH054A (Harold Structures Part 2)
ESA CH057 (Harold Structures Part 3)
ESA CM005 (Manhattan South Structures)
ESA CM006 (Manhattan North Structures)
ESA CM007 (Grand Central Terminal Caverns)
ESA CM014B (Grand Central Terminal Concourse Facility and Fit-Out)
ESA CQ031 (Queens Bored Tunnels)
ESA CQ032 (Queens Structures and Plaza Substation)
ESA CQ033 (Mid Day Storage Yard)
ESA CS086 (Systems Package No. 3)
ESA CS179 (Systems Facilities Package No. 1)
 
			